Loading...
Case Study | Logistics
Sinotrans Bonded Warehouse
10,005 Pallets | 8,200m² | Guangdong, China
View Results

Project Results

Measurable improvements after ASRS implementation

450

Pallets/Hour

+60%

Space Efficiency

-40%

Labor Cost

-99%

Error Rate

Challenge & Solution

How we transformed Sinotrans' bonded warehouse operations

The Challenge

Sinotrans, a leading logistics provider in Guangdong, faced critical challenges with their bonded warehouse operations:

  • Product traceability issues - No system to track product movement, unable to identify where products were lost in the process
  • High-value goods handling - Managing Huawei's high-value products requiring enhanced security and accountability
  • Extremely high volume - Handling thousands of pallets daily with tight deadlines
  • Limited throughput - Manual operations couldn't meet peak season demands
  • Labor intensive - Required large workforce for 24/7 operations
  • Inventory accuracy - Manual tracking led to discrepancies in bonded goods
  • Space utilization - Traditional racking couldn't maximize warehouse capacity

Our Solution

MB Intelligence designed and implemented a high-throughput ASRS solution tailored for bonded warehouse operations:

  • 40 Four-Way Shuttles - High-speed automated storage and retrieval system
  • 22 Vertical Lifters - Efficient vertical transport between levels
  • WMS & WCS Integration - Intelligent software for real-time inventory tracking
  • Multi-layer Verification - Comprehensive product traceability system ensuring every movement is recorded and traceable
  • 450 Pallets/Hour - Industry-leading throughput capacity
  • Optimized Layout - 10,005 pallet positions in 8,200m² floor area

Project Specifications

Client Sinotrans (中国外运)
Industry Logistics | Bonded Warehouse
Location Guangdong, China
Storage Capacity 10,005 Pallet Positions
Floor Area 8,200 m²
Throughput 450 Pallets/Hour
SKU Count 10,000+ SKUs
Equipment 40 Four-Way Shuttles + 22 Vertical Lifters
Automation Level Fully Automated Inbound/Outbound
Completion Year 2019

Key Benefits

High Throughput

450 pallets per hour throughput capacity for demanding logistics operations.

Maximum Density

10,005 pallet positions in 8,200m², optimized for bonded warehouse operations.

Fully Automated

40 shuttles and 22 lifters working together for seamless 24/7 operations.

Labor Reduction

40% reduction in labor costs with automated handling and tracking.

Bonded Compliance

WMS integration for accurate bonded goods tracking and customs compliance.


Project Gallery

Related Projects

Want similar results for your warehouse?

Contact us for a free consultation on ASRS solutions.

Get Free Consultation